The Nanjing Dekema Electrical Project, located in Nanjing, Jiangsu Province, utilizes 3,065 tons of steel. The single-story FAB production workshop covers an area of approximately 10,000 square meters. Below the third floor, the structure features a reinforced concrete frame system, while above the third floor, a space steel roof system is employed, requiring about 3,000 tons of steel. Each main steel truss spans 96 meters with a 48-meter clear span, and the trusses are spaced 12 meters apart. After on-site assembly, each truss is lifted into place in two sections—each section weighing up to 130 tons. Once assembled, the entire truss unit is slid into position and installed as a whole.